The starting point of Shandong Luqiao-Jigao Expressway is at the Tangwangnan Interchange in the East Ring Section of the Second Ring Road of Jinan Ring Expressway, and the ending point is at the Jinan-Gaoqing Expressway at the Pengjia junction of Changshen Expressway. The total length of the route is about 93.3 kilometers and it adopts two-way 4-6 lanes. The project is scheduled to be completed and put into operation by the end of 2022.
Our company's ZENITH1500 automatic block forming machine production line is used in the project to provide concrete precast parts such as curbstones for the construction of the project.